High Reach Demolition

High Reach Demolition

High-reach demolition" is a specialized method used to demolish tall structures, such as high-rise buildings, chimneys, or bridges. It involves using specialized equipment, such as high-reach jaw crusher & shear cutter technology attach with excavators to safely and efficiently demolish structures at heights.

Here are some key considerations and safety measures for high-reach demolition:

Demolition Plan: A comprehensive demolition plan is created before the start of any demolition project. This plan includes detailed information about the building, site conditions, and the proposed demolition methods. It outlines the sequence of demolition activities, identifies potential hazards, and specifies the safety measures to be implemented.


Hazard Identification and Risk Assessment: A thorough assessment of potential hazards associated with the building demolition is conducted. This includes identifying risks such as structural instability, hazardous materials, utilities, nearby structures, and environmental concerns. Risk mitigation measures are then developed to minimize these risks.


Permitting and Compliance: Compliance with all relevant permits, regulations, and local laws is essential. This may include obtaining permits for demolition, asbestos removal, noise control, and waste disposal. Regular inspections by regulatory authorities may also be required to ensure compliance.


Safety Training: All workers involved in the demolition process must receive appropriate safety training. This includes training on hazard recognition, proper use of personal protective equipment (PPE), safe equipment operation, and emergency procedures. Regular refresher training should be provided to ensure ongoing safety awareness.


Structural Stability Assessment: Prior to demolition, a structural engineer should assess the stability of the building to determine the safest demolition methods. This assessment helps identify potential collapse risks and ensures that appropriate precautions are taken.


Removal of Hazardous Materials: If the building contains hazardous materials such as asbestos, lead, or mold, proper removal procedures must be followed. This may involve hiring licensed professionals to safely handle and dispose of these materials in accordance with applicable regulations.


Site Preparation: Adequate site preparation is crucial to ensure a safe demolition process. This may involve securing the perimeter, erecting safety barriers, removing debris, and establishing designated access and egress points for workers and equipment.


Equipment and Machinery Safety: All equipment and machinery used during demolition should be properly maintained, inspected, and operated by trained personnel. Safety features such as guardrails, fall protection systems, and warning signs should be in place and utilized.


Waste Management: Proper waste management procedures should be followed to ensure the safe handling and disposal of demolition debris. This may involve sorting and recycling materials, as well as disposing of hazardous waste in accordance with applicable regulations.


Emergency Response Plan: An emergency response plan should be developed and communicated to all workers. This plan outlines procedures for responding to accidents, injuries, fires, or other emergencies that may occur during the demolition process.


It is important to note that specific safety measures and documents may vary depending on the size and complexity of the demolition project, as well as local regulations and industry best practices. Consulting with experienced professionals and engaging in ongoing communication and collaboration with all stakeholders is essential for a safe and successful building demolition.

Head office

Shop No. 8-3-168/H/3, Sanman Hotel Lane,, Sultan Bagh, Erragadda, Hyderabad, Telangana 500018

P: 9849 70 8003

M: 9948 55 5552

E: malik_demolition@yahoo.com


© COPYRIGHT 2023, ALL RIGHTS RESERVED